Fieldstone Parkette Playground Installation Notice

Town of Mono's
Premier
WinePaint
Night

Share this on Facebook | Twitter | Email

Council approved the proposal submitted by the playground manufacturing company PlayPower LT Canada Inc. for the design and installation of playground equipment to meet the needs of 2 through 12-year olds was approved.

Features of this accessible playground include:

  • Swings,
  • Bouncy toys,
  • Climbing net,
  • Slides,
  • Playhouses,
  • Tire climbers

It was determined that the best place for the installation would be on the north side of the Fieldstone Trail, just east of the walkway between 26 and 28 Meek Avenue. There is a beautiful vista from this locale which will enhance the overall enjoyment of the park.

Installation of the playground is scheduled to take place between October 5 and 9, 2020. Prior to this date, minor regrading of the land will occur to create a flat surface for the installation. Regrading is scheduled for the week of September 21. All equipment for regrading and installation will access the locale from the trail entrance off First Line.

Once the play equipment is installed, final landscaping including the planting of shrubbery, access walkways, benches, and garbage receptacles will be completed.

Fieldstone Parkette Design
Fieldstone Parkette Design. Note: the teeter totter has been replaced with a bouncy ladybug

Apply Now
View Larger Map


Uniform Sizing Chart - Please Measure for Proper Fit
Youth XS S M L XL
Chest Size 22" - 23" 24" - 26" 26" - 29" 29" - 32" 32" - 34.5"
Adult   AS AM AL  
Chest Size   37" - 38" 39" - 40" 41" - 43"  

 

Registration Is Closed

Registration closed on April 22, 2019.



View larger map
View Larger Map
Date Posted:
September 11, 2020